PowerSystemProjectLifecycleToBeDeleted
Represent the base lifecycle of a functional model change that could be a construction of new elements.
Type |
Class |
---|---|
URI |
|
CIM standard (perspective) |
IEC61970 (Grid) |
Slots
Name | Cardinality | Type | Description |
---|---|---|---|
0..1 |
The date the Power System Project is in cancelled stage. |
||
0..1 |
The date Power System Project is in committed stage. |
||
0..1 |
The date Power System Project is in build stage. |
||
0..1 |
The date Power System Project is in planning stage. |
cancelled
The date the Power System Project is in cancelled stage.
URI |
|
---|---|
Cardinality |
0..1 |
Type |
committed
The date Power System Project is in committed stage.
URI |
|
---|---|
Cardinality |
0..1 |
Type |
inBuild
The date Power System Project is in build stage.
URI |
|
---|---|
Cardinality |
0..1 |
Type |