RUCAwardInstruction
This class models the information about the RUC awards.
Type |
Class |
---|---|
URI |
|
CIM standard (perspective) |
IEC62325 (Market) |
Slots
Name | Cardinality | Type | Description |
---|---|---|---|
1..* |
n/a |
||
0..1 |
The RUC Award of a resource is the portion of the RUC Capacity that is not under RA or RMR contracts. The RUC Award of a resource is the portion of the RUC Capacity that is eligible for RUC Availability payment. |
||
0..1 |
The RUC Capacity of a resource is the difference between (i) the RUC Schedule and (ii) the higher of the DA Schedule and the Minimum Load. |
||
0..1 |
The RUC Schedule of a resource is its output level that balances the load forecast used in RUC. The RUC Schedule in RUC is similar to the DA Schedule in DAM. |
||
0..1 |
n/a |
||
0..1 |
Marginal Price ($/MW) for the commodity (Regulation Up, Regulation Down, Spinning Reserve, or Non-spinning reserve) for pricing run. |
||
0..1 |
major product type may include the following but not limited to: Energy Regulation Up Regulation Dn Spinning Reserve Non-Spinning Reserve Operating Reserve |
||
0..1 |
n/a |
||
0..1 |
n/a |
||
0..1 |
n/a |
clearedPrice
Marginal Price ($/MW) for the commodity (Regulation Up, Regulation Down, Spinning Reserve, or Non-spinning reserve) for pricing run.
URI |
|
---|---|
Cardinality |
0..1 |
Type |
marketProductType
+++major product type may include the following but not limited to:
Energy Regulation Up Regulation Dn Spinning Reserve Non-Spinning Reserve Operating Reserve+++
URI |
|
---|---|
Cardinality |
0..1 |
Type |
RUCAward
The RUC Award of a resource is the portion of the RUC Capacity that is not under RA or RMR contracts. The RUC Award of a resource is the portion of the RUC Capacity that is eligible for RUC Availability payment.
URI |
|
---|---|
Cardinality |
0..1 |
Type |
RUCCapacity
The RUC Capacity of a resource is the difference between (i) the RUC Schedule and (ii) the higher of the DA Schedule and the Minimum Load.
URI |
|
---|---|
Cardinality |
0..1 |
Type |
RUCSchedule
The RUC Schedule of a resource is its output level that balances the load forecast used in RUC. The RUC Schedule in RUC is similar to the DA Schedule in DAM.
URI |
|
---|---|
Cardinality |
0..1 |
Type |